March 21, 2013
Vena Cava studio visit.  Live now on Oyster Magazine
Gillian SaganskyPhotography: Niko MargarosFilm: MATTE FILMSFilm Editor: Matthew RoweanPhotography Assistant: Aaron Lippman 

Vena Cava studio visit.  Live now on Oyster Magazine


Gillian Sagansky

Photography: Niko Margaros
Film: MATTE FILMS
Film Editor: Matthew Rowean
Photography Assistant: Aaron Lippman 

March 21, 2013
OYSTER

Our Studio visit with Vena Cava just went live on Oyster Magazine.

Interview & writing: Gillian Sagansky

Photography: Nike Margaros

Video: Brett Kincaid & MATTE FILMS

Editing: Matthew Rowean

March 14, 2013
2013 work so far…

2013 work so far…

March 12, 2013
Evergreen Heavy Gell coat over gold underpainting.  Base work for this piece done.

Evergreen Heavy Gell coat over gold underpainting.  Base work for this piece done.

March 12, 2013
Three new pieces in progress.  Working in black, white, silver and raw wood tone for this Body.  Ongoing series of sheets and loose figurative reference.

Three new pieces in progress.  Working in black, white, silver and raw wood tone for this Body.  Ongoing series of sheets and loose figurative reference.

March 7, 2013
Aurelia in bloom.

Acrylic on wood.
36’ x 80’
2013

Aurelia in bloom.

Acrylic on wood.

36’ x 80’

2013

March 7, 2013
One of two ‘looser’ pieces I started this evening after an inspiring visit to the armory show.  Leaving the base wood on these two & letting it show through a bit.  Also not covering to the edge as in some of the other paintings. Part of my ‘let it go’ series.

One of two ‘looser’ pieces I started this evening after an inspiring visit to the armory show.  Leaving the base wood on these two & letting it show through a bit.  Also not covering to the edge as in some of the other paintings. Part of my ‘let it go’ series.

March 7, 2013
City Lights. Detail shot of bottom 1/3 of piece.

City Lights. Detail shot of bottom 1/3 of piece.

February 20, 2013
Finally got some time to get back into this piece.  Tonight I finished the midtones.  Tomorrow; final details and done…

Finally got some time to get back into this piece.  Tonight I finished the midtones.  Tomorrow; final details and done…

February 18, 2013
Upcoming edit for Vena Cava showroom visit shot last week.

Upcoming edit for Vena Cava showroom visit shot last week.

February 7, 2013

Stopped by Vena Cava this afternoon for a cool little shoot & film.  something very cool coming soon from Gillian Sagansky

February 7, 2013
Close up of neon install on the aluminum panel currently being installed in TOY. Should be up in a few days

Close up of neon install on the aluminum panel currently being installed in TOY. Should be up in a few days

February 6, 2013
Work in progress…handwriting samples for FULL MOON branding…cooking up some hot fire for this one.

Work in progress…handwriting samples for FULL MOON branding…cooking up some hot fire for this one.

February 5, 2013
Work In Progress

Work In Progress

February 4, 2013
New work starting to stack up…finally found a flow.
all acrylic on 2/4 masonite panels.

New work starting to stack up…finally found a flow.

all acrylic on 2/4 masonite panels.

Liked posts on Tumblr: More liked posts »